Project Completion Certificate (Ground Water)
Scheme ID: 20050639 Name of Scheme: BELAHI WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 2980 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Dec-2022 Actual Date of Completion (Capex): 31-Dec-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21/82.5 BELAHI 26.153721 82.261078
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 630LPM/44M BELAHI 26.153721 82.261078
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL/12M BELAHI 26.153721 82.261078
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.0293
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 11.605
2 HDPE-PN-6 , PE-100 75 1.537
3 HDPE-PN-6 , PE-100 90 1.489
4 HDPE-PN-6 , PE-100 110 0.868
5 HDPE-PN-6 , PE-100 140 0.409
6 HDPE-PN-6 , PE-100 160 0.182
HSC Connection
Sno. Total Nos.
1 421
Other Details
2.37
2.37
2.37
01-May-2026
02-Jun-2026