Project Completion Certificate (Ground Water)
Scheme ID: 20050915 Name of Scheme: JAIGAHAN VILLAGE WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 2715 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Dec-2022 Actual Date of Completion (Capex): 14-Jun-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300X300 12 M/64.13 M JAIGAHAN 25.943412 82.736176
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP 600 LPM/46 M JAIGAHAN 25.943418 82.736177
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL /14 M JAIGAHAN 25.943415 82.736178
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI, K-7 100 0.0164 YES
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.622 YES
2 HDPE 75 1.259 YES
3 HDPE 63 2.996 YES
4 HDPE 110 .243 YES
5 HDPE 140 .632 YES
6 HDPE 160 .765 YES
7 HDPE 180 .386 YES
HSC Connection
Sno. Total Nos.
1 393
Other Details
2.08
2.08
1.80
14-Jun-2026
15-Jun-2026