Project Completion Certificate (Ground Water)
Scheme ID: 20050948 Name of Scheme: BOKHAREPUR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3330 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 02-Dec-2023 Actual Date of Completion (Capex): 01-May-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 14.00/79.00 BOKHAREPUR 26.129554 82.107567
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 690LPM/44M BOKHAREPUR 26.129554 82.107567
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200KL/14M BOKHAREPUR 26.129554 82.107567
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 6.860
2 HDPE-PN-6 , PE-100 75 2.165
3 HDPE-PN-6 , PE-100 90 1.292
4 HDPE-PN-6 , PE-100 110 0.747
5 HDPE-PN-6 , PE-100 140 0.469
6 HDPE-PN-6 , PE-100 160 0.128
7 HDPE-PN-6 , PE-100 200 0.373
HSC Connection
Sno. Total Nos.
1 460
Other Details
2.36
0.00
2.26
05-Jan-2026
01-May-2026