Project Completion Certificate (Ground Water)
Scheme ID: 20051126 Name of Scheme: HAMZABAD WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 2777 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 02-Dec-2023 Actual Date of Completion (Capex): 01-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 22.00/75.00 HAMZABAD 26.265909 82.266405
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 550LPM/45M HAMZABAD 26.265909 82.266405
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL/14M HAMZABAD 26.265909 82.266405
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 15.243
2 HDPE-PN-6 , PE-100 75 2.442
3 HDPE-PN-6 , PE-100 90 1.881
4 HDPE-PN-6 , PE-100 110 0.442
5 HDPE-PN-6 , PE-100 140 0.749
HSC Connection
Sno. Total Nos.
1 480
Other Details
2.17
0.00
2.23
08-Jan-2026
01-May-2026