Project Completion Certificate (Ground Water)
Scheme ID: 20051161 Name of Scheme: MAJHAULI SINGLE VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1844 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2027 Actual Date of Completion (Capex): 20-Aug-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.09/100.75 Majhauli 28.898797 78.567561
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Powered Pump 390/39 Majhauli 28.898797 78.567561
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Cast in situ Zinc Zincalume 125/12 Majhauli 28.898797 78.567561
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 PE100/HDPE 90 0.132
2 PN-6 PE100/HDPE 63 3.3688
3 PN-6 PE100/HDPE 110 0.527
4 PN-6 PE100/HDPE 125 0.338
5 PN-6 PE100/HDPE 140 0.207
HSC Connection
Sno. Total Nos.
1 296
Other Details
1.54
0.00
0.00
02-Nov-2026
03-Nov-2026