Project Completion Certificate (Ground Water)
Scheme ID: 20051601 Name of Scheme: JASWANTPUR No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 6492 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Feb-2026 Actual Date of Completion (Capex): 01-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 200 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 7.80
2 HDPE PIPE PN -6: CLASS PE -100 75 0.30
3 HDPE PIPE PN -6: CLASS PE -100 90 1.27
4 HDPE PIPE PN -6: CLASS PE -100 110 0.93
5 HDPE PIPE PN -6: CLASS PE -100 125 0.44
6 HDPE PIPE PN -6: CLASS PE -100 140 0.02
7 HDPE PIPE PN -6: CLASS PE -100 160 0.19
8 HDPE PIPE PN -6: CLASS PE -100 180 0.30
9 HDPE PIPE PN -6: CLASS PE -100 200 0.01
HSC Connection
Sno. Total Nos.
1 1065
Other Details
3.03
3.03
2.98
31-Oct-2025
01-Nov-2025