Scheme ID: 20051879 Name of Scheme: GIRHAUNA & MISIRPUR DHEKAHA WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 3220 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 02-Dec-2023 Actual Date of Completion (Capex): 01-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 27.00/248.30 GIRHAUNA & MISIRPUR DHEKAHA 26.199302 82.536155
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 670LPM/44M GIRHAUNA & MISIRPUR DHEKAHA 26.199302 82.536155
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200KL/14M GIRHAUNA & MISIRPUR DHEKAHA 26.199302 82.536155
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 18.956
2 HDPE-PN-6 , PE-100 75 1.482
3 HDPE-PN-6 , PE-100 90 1.052
4 HDPE-PN-6 , PE-100 140 0.838
5 HDPE-PN-6 , PE-100 160 0.113
6 HDPE-PN-6 , PE-100 200 0.023
7 HDPE-PN-6 , PE-100 110 0.195
HSC Connection
Sno. Total Nos.
1 425
Other Details
2.52
0.00
2.46
10-Apr-2026
01-May-2026