Project Completion Certificate (Ground Water)
Scheme ID: 20052468 Name of Scheme: SHAFIPUR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 4610 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Dec-2022 Actual Date of Completion (Capex): 31-Dec-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 11/81.5 SHAFIPUR 26.087117 82.36474
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 930LPM/42M SHAFIPUR 26.087117 82.36474
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100KL/12M SHAFIPUR 26.087231 82.364622
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 25.531
2 HDPE-PN-6 , PE-100 75 2.901
3 HDPE-PN-6 , PE-100 90 1.296
4 HDPE-PN-6 , PE-100 110 2.556
5 HDPE-PN-6 , PE-100 140 15.805
6 HDPE-PN-6 , PE-100 160 6.953
7 HDPE-PN-6 , PE-100 200 0.390
HSC Connection
Sno. Total Nos.
1 480
Other Details
3.52
3.52
3.53
05-May-2026
08-May-2026