Project Completion Certificate (Ground Water)
Scheme ID: 20052975 Name of Scheme: Bairi Sawai No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 5528 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Nov-2023 Actual Date of Completion (Capex): 27-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 25/126.07 BAIRI SAWAI 26.554996 80.084323
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 700/64 BAIRI SAWAI 26.554996 80.084323
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 400/18 BAIRI SAWAI 26.554996 80.084323
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.573
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 11.098
2 HDPE 90 3.958
3 HDPE 110 0.772
4 HDPE 125 0.533
5 HDPE 140 1.131
6 HDPE 160 0.679
7 HDPE 180 0.355
8 HDPE 200 0.736
HSC Connection
Sno. Total Nos.
1 1191
Other Details
6.39
0.00
5.25
11-Mar-2024
12-Mar-2024