Project Completion Certificate (Ground Water)
Scheme ID: 20053251 Name of Scheme: SEMLA & NAINU NANGAL WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 3949 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 10-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 30.05 / 124.65 Semla 29.06694 78.405108
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 850 / 53 Semla 29.06694 78.405108
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/12 Semla 29.06694 78.405108
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 150 0.036
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.7221
2 HDPE 75 1.0406
3 HDPE 90 0.2538
4 HDPE 110 0.481
5 HDPE 125 0.7051
6 HDPE 160 0.2083
7 HDPE 180 0.036
8 HDPE 140 0.11
HSC Connection
Sno. Total Nos.
1 677
Other Details
3.03
0.00
3.08
10-May-2025
11-May-2025