Project Completion Certificate (Ground Water)
Scheme ID: 20053730 Name of Scheme: HALAPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 10
Total Population Covered: 2610 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 02-Dec-2023 Actual Date of Completion (Capex): 01-Apr-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 25.00/97.30 HALAPUR 26.376302 82.375253
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 550LPM/45M HALAPUR 26.376302 82.375253
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL/14M HALAPUR 26.376302 82.375253
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.010
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 12.665
2 HDPE-PN-6 , PE-100 75 5.296
3 HDPE-PN-6 , PE-100 90 1.332
4 HDPE-PN-6 , PE-100 110 0.480
5 HDPE-PN-6 , PE-100 140 0.180
6 HDPE-PN-6 , PE-100 160 0.108
HSC Connection
Sno. Total Nos.
1 400
Other Details
2.14
0.00
2.22
12-Apr-2026
01-May-2026