Project Completion Certificate (Ground Water)
Scheme ID: 20055761 Name of Scheme: ISHAKPUR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2270 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Dec-2023 Actual Date of Completion (Capex): 25-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.00/90.80 ISHAKPUR 26.305666 82.150674
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 480LPM/43M ISHAKPUR 26.305666 82.150674
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125KL/12M ISHAKPUR 26.305666 82.150674
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.026
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 9.049
2 HDPE-PN-6 , PE-100 75 0.813
3 HDPE-PN-6 , PE-100 90 0.615
4 HDPE-PN-6 , PE-100 110 0.563
5 HDPE-PN-6 , PE-100 140 0.450
6 HDPE-PN-6 , PE-100 160 0.018
HSC Connection
Sno. Total Nos.
1 300
Other Details
1.89
0.00
1.89
18-Feb-2026
01-May-2026