Project Completion Certificate (Ground Water)
Scheme ID: 20055880 Name of Scheme: RAMDASPUR Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2630 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Dec-2023 Actual Date of Completion (Capex): 25-Feb-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.00/87.80 RAMDASPUR 26.346245 82.133191
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 550LPM/45M RAMDASPUR 26.346245 82.133191
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL/14M RAMDASPUR 26.346245 82.133191
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 11.748
2 HDPE-PN-6 , PE-100 75 2.266
3 HDPE-PN-6 , PE-100 90 1.312
4 HDPE-PN-6 , PE-100 110 2.571
5 HDPE-PN-6 , PE-100 140 0.271
6 HDPE-PN-6 , PE-100 160 0.022
HSC Connection
Sno. Total Nos.
1 541
Other Details
2.32
0.00
2.29
18-Apr-2026
01-May-2026