| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20055880 | Name of Scheme: RAMDASPUR Water Supply Scheme | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 2630 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 26-Dec-2023 | Actual Date of Completion (Capex): 25-Feb-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 21.00/87.80 | RAMDASPUR | 26.346245 | 82.133191 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump-1 | 550LPM/45M | RAMDASPUR | 26.346245 | 82.133191 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150KL/14M | RAMDASPUR | 26.346245 | 82.133191 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe K-7 | 100 | 0.016 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE-PN-6 , PE-100 | 63 | 11.748 | |
| 2 | HDPE-PN-6 , PE-100 | 75 | 2.266 | |
| 3 | HDPE-PN-6 , PE-100 | 90 | 1.312 | |
| 4 | HDPE-PN-6 , PE-100 | 110 | 2.571 | |
| 5 | HDPE-PN-6 , PE-100 | 140 | 0.271 | |
| 6 | HDPE-PN-6 , PE-100 | 160 | 0.022 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 541 |