| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20056616 | Name of Scheme: JAMALPUR VILLAGE WATER SUPPLY SCHEME | No. of Villages: 6 | No. of Habitation Covered: 19 |
| Total Population Covered: 3745 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 26-Sep-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200*150 | 257/15 | Jamalpur | 25.71955 | 82.657283 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5HP | 748/43 | Jamalpur | 25.71955 | 82.657283 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225KL/12m | Jamalpur | 25.720633 | 82.65145 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 150 | 0.0106 | Yes |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6 | 90 | 3.217 | Yes |
| 2 | PN-6 | 75 | 6.53 | Yes |
| 3 | PN-6 | 63 | 7.702 | Yes |
| 4 | PN-6 | 110 | 1.806 | Yes |
| 5 | PN-6 | 140 | 1.164 | Yes |
| 6 | PN-6 | 160 | 0.534 | Yes |
| 7 | PN-6 | 180 | 1.007 | Yes |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 550 |