Project Completion Certificate (Ground Water)
Scheme ID: 20056616 Name of Scheme: JAMALPUR VILLAGE WATER SUPPLY SCHEME No. of Villages: 6 No. of Habitation Covered: 19
Total Population Covered: 3745 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 26-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200*150 257/15 Jamalpur 25.71955 82.657283
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5HP 748/43 Jamalpur 25.71955 82.657283
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225KL/12m Jamalpur 25.720633 82.65145
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 150 0.0106 Yes
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 90 3.217 Yes
2 PN-6 75 6.53 Yes
3 PN-6 63 7.702 Yes
4 PN-6 110 1.806 Yes
5 PN-6 140 1.164 Yes
6 PN-6 160 0.534 Yes
7 PN-6 180 1.007 Yes
HSC Connection
Sno. Total Nos.
1 550
Other Details
3.38
3.38
2.68
26-Sep-2024
26-Sep-2025