| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20056982 | Name of Scheme: BADELA & KOTWARI WSS | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 4596 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 15-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 30.00/92.40 | BADELA & KOTWARI | 27.97113 | 80.058977 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP-1 | 54.60 M3 / 45 M | BADELA & KOTWARI | 27.97113 | 80.058977 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT - 1 | 250 KL - 12 M | BADELA & KOTWARI | 27.97116 | 80.058982 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI- K7 | 150 | 0.040 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6KG | 63 | 8.635 | |
| 2 | HDPE / 6KG | 75 | 1.765 | |
| 3 | HDPE / 6KG | 90 | 1.611 | |
| 4 | HDPE / 6KG | 110 | 0.186 | |
| 5 | HDPE / 6KG | 140 | 0.511 | |
| 6 | HDPE / 6KG | 160 | 1.744 | |
| 7 | HDPE / 6KG | 200 | 0.016 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 992 |