| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20057160 | Name of Scheme: GONDA RAO JJM | No. of Villages: 1 | No. of Habitation Covered: 11 |
| Total Population Covered: 5760 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 02-Feb-2024 | Actual Date of Completion (Capex): 19-Oct-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 30M/ 101.8 M | GONDA RAO | 27.332404 | 80.335062 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 1.190 M³ per Min /41Mtr | GONDA RAO | 27.332404 | 80.335062 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 350KL/ 12 Mtr | GONDA RAO | 27.338804 | 80.332622 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. Pipe | 200 | 0.022 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6, Class PE-100 | 63 | 4.925 | |
| 2 | HDPE Pipe PN-6, Class PE-100 | 75 | 6.5187 | |
| 3 | HDPE Pipe PN-6, Class PE-100 | 90 | 5.2065 | |
| 4 | HDPE Pipe PN-6, Class PE-100 | 110 | 1.0553 | |
| 5 | HDPE Pipe PN-6, Class PE-100 | 125 | 0.4126 | |
| 6 | HDPE Pipe PN-6, Class PE-100 | 140 | 0.479 | |
| 7 | HDPE Pipe PN-6, Class PE-100 | 200 | 0.2705 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1053 |