Project Completion Certificate (Ground Water)
Scheme ID: 20057198 Name of Scheme: Tazuddinpur No. of Villages: 2 No. of Habitation Covered: 14
Total Population Covered: 4518 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-Jul-2024 Actual Date of Completion (Capex): 21-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well -300X200 26.52/167.60 Tazuddinpur 25.689982 82.603898
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Pump-20HP 950/49.00 Tazuddinpur 25.689982 82.603898
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250KL-14M Tazuddinpur 25.689896 82.603825
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 200 0.013
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 200 0.121
2 HDPE PIPE PN-6 140 1.499
3 HDPE PIPE PN-6 110 1.296
4 HDPE PIPE PN-6 90 0.902
5 HDPE PIPE PN-6 75 1.470
6 HDPE PIPE PN-6 63 15.339
HSC Connection
Sno. Total Nos.
1 607
Other Details
2.77
2.77
2.46
21-Mar-2026
22-Mar-2026