Project Completion Certificate (Ground Water)
Scheme ID: 20057485 Name of Scheme: HUSAINPUR DAULATPUR WSS No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2360 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 30-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18/91 HUSAINPUR DAULATPUR 27.786622 79.698091
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT - PUMP 1 28.98/45 HUSAINPUR DAULATPUR 27.786622 79.698091
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 150/16 HUSAINPUR DAULATPUR 27.786412 79.698192
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 6.033
2 HDPE / 6KG 75 1.369
3 HDPE / 6KG 90 1.397
4 HDPE / 6KG 110 0.993
5 HDPE / 6KG 140 1.578
HSC Connection
Sno. Total Nos.
1 538
Other Details
1.97
0.00
2.16
30-Dec-2023
06-Dec-2024