| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20057496 | Name of Scheme: JAPANAPUR WSS | No. of Villages: 3 | No. of Habitation Covered: 4 |
| Total Population Covered: 2910 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 22-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 21.00 / 99.40 | JAPANAPUR | 27.905863 | 80.03725 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP - 1 | 34.20 M3 / 43 M | JAPANAPUR | 27.905863 | 80.03725 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175 KL - 14 M | JAPANAPUR | 27.905875 | 80.03734 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 125 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6 KG | 63 | 2.990 | |
| 2 | HDPE / 6 KG | 75 | 0.233 | |
| 3 | HDPE / 6 KG | 110 | 0.142 | |
| 4 | HDPE / 6 KG | 140 | 1.082 | |
| 5 | HDPE / 6 KG | 160 | 2.705 | |
| 6 | HDPE / 6 KG | 180 | 0.523 | |
| 7 | HDPE / 6 KG | 200 | 2.257 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 506 |