Project Completion Certificate (Ground Water)
Scheme ID: 20057613 Name of Scheme: PATKUAWAN GOGP JJM No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 5950 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 10-Sep-2024 Actual Date of Completion (Capex): 27-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30M/98M PATKUAWAN 27.477433 80.122467
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 76.2M³/45M PATKUAWAN 27.477433 80.122467
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 375KL/16M PATKUAWAN 27.477433 80.122467
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 6.286
2 HDPE PIPE PN:-6 75 5.322
3 HDPE PIPE PN:-6 90 2.613
4 HDPE PIPE PN:-6 110 4.406
5 HDPE PIPE PN:-6 125 0.217
6 HDPE PIPE PN:-6 140 0.00
7 HDPE PIPE PN:-6 160 0.919
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 0.581
HSC Connection
Sno. Total Nos.
1 1125
Other Details
3.93
0.00
3.90
26-Jul-2025
21-Sep-2025