Project Completion Certificate (Ground Water)
Scheme ID: 20057632 Name of Scheme: PHUKHA TELIYANI JJM No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 4750 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Aug-2024 Actual Date of Completion (Capex): 07-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30M/119M PHUKA TELIYANI 27.436742 80.329631
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 59.4M³/45M PHUKA TELIYANI 27.436742 80.329631
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300KL/16M PHUKA TELIYANI 27.436742 80.329631
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.021
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 2.573
2 HDPE PIPE PN:-6 75 4.195
3 HDPE PIPE PN:-6 90 1.184
4 HDPE PIPE PN:-6 110 0.344
5 HDPE PIPE PN:-6 125 1.197
6 HDPE PIPE PN:-6 140 0.054
7 HDPE PIPE PN:-6 160 0.868
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 2.374
HSC Connection
Sno. Total Nos.
1 930
Other Details
3.27
0.00
3.25
06-Aug-2025
26-Sep-2025