Scheme ID: 20057673 Name of Scheme: GANGAPUR JJM No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2230 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 02-Feb-2024 Actual Date of Completion (Capex): 20-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18 M/ 93 M GANGAPUR 27.206591 80.239556
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.470 M³ per Min /43Mtr GANGAPUR 27.206591 80.239556
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL/ 14 Mtr GANGAPUR 27.206465 80.239601
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.021
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 3.261
2 HDPE Pipe PN-6: Class PE-100 75 2.3955
3 HDPE Pipe PN-6: Class PE-100 90 1.1226
4 HDPE Pipe PN-6: Class PE-100 110 1.1102
5 HDPE Pipe PN-6: Class PE-100 125 0.2855
6 HDPE Pipe PN-6: Class PE-100 160 0.5315
HSC Connection
Sno. Total Nos.
1 489
Other Details
2.02
0.00
2.02
19-May-2024
23-Sep-2026