Scheme ID: 20057688 Name of Scheme: PURWA DEORIYA (GOGP) JJM No. of Villages: 3 No. of Habitation Covered: 8
Total Population Covered: 4470 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Aug-2024 Actual Date of Completion (Capex): 18-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27M/105M PURWA DEORIA 27.477181 80.345236
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 56.4M³/45M PURWA DEORIA 27.477181 80.345236
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275KL/16M PURWA DEORIA 27.477181 80.345236
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 40.3
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 6.683
2 HDPE PIPE PN:-6 75 3.985
3 HDPE PIPE PN:-6 90 1.42
4 HDPE PIPE PN:-6 110 0.451
5 HDPE PIPE PN:-6 125 1.277
6 HDPE PIPE PN:-6 140 0.924
7 HDPE PIPE PN:-6 160 0.795
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 0.874
HSC Connection
Sno. Total Nos.
1 855
Other Details
3.32
0.00
3.25
17-Jun-2025