Project Completion Certificate (Ground Water)
Scheme ID: 20057773 Name of Scheme: BAGHOURAMAL JJM No. of Villages: 9 No. of Habitation Covered: 13
Total Population Covered: 5660 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Aug-2024 Actual Date of Completion (Capex): 17-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 26M/124M BAGHOURAMAL 27.391948 79.944255
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 69M³/45M BAGHOURAMAL 27.391948 79.944255
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 350KL/16M BAGHOURAMAL 27.391948 79.944255
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.001
2 DI PIPE 200 0.039
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 5.815
2 HDPE PIPE PN:-6 75 6.824
3 HDPE PIPE PN:-6 90 3.953
4 HDPE PIPE PN:-6 110 3.192
5 HDPE PIPE PN:-6 125 1.921
6 HDPE PIPE PN:-6 140 1.175
7 HDPE PIPE PN:-6 160 0.025
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 1.588
HSC Connection
Sno. Total Nos.
1 964
Other Details
4.15
0.00
4.15
16-Jul-2025
25-Sep-2025