Project Completion Certificate (Ground Water)
Scheme ID: 20057814 Name of Scheme: BAJPUR NAKTAURA (GOGP) JJM No. of Villages: 4 No. of Habitation Covered: 7
Total Population Covered: 7470 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Aug-2024 Actual Date of Completion (Capex): 19-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30M/99M BAJPUR NAKTAURA 27.406663 79.892696
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 87.6M³/47M BAJPUR NAKTAURA 27.406663 79.892696
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 425KL/18M BAJPUR NAKTAURA 27.406663 79.892696
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.002
2 DI PIPE 200 0.046
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 8.909
2 HDPE PIPE 75 7.027
3 HDPE PIPE 90 2.737
4 HDPE PIPE 110 0.035
5 HDPE PIPE 125 0.120
6 HDPE PIPE 140 1.964
7 HDPE PIPE 160 3.108
8 HDPE PIPE 180 0.00
9 HDPE PIPE 200 0.578
HSC Connection
Sno. Total Nos.
1 1290
Other Details
4.68
0.00
4.67
18-Aug-2025
25-Sep-2025