Project Completion Certificate (Ground Water)
Scheme ID: 20057825 Name of Scheme: TANDIYAWAN JJM No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 7090 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 10-Sep-2024 Actual Date of Completion (Capex): 23-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 36M/105M TANDIYAWAN 27.446598 80.256504
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 84.6M³/45M TANDIYAWAN 27.446598 80.256504
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 425KL/16M TANDIYAWAN 27.446598 80.256504
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.046
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 3.853
2 HDPE PIPE PN:-6 75 3.901
3 HDPE PIPE PN:-6 90 6.346
4 HDPE PIPE PN:-6 110 1.463
5 HDPE PIPE PN:-6 125 1.113
6 HDPE PIPE PN:-6 140 0.00
7 HDPE PIPE PN:-6 160 1.462
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 1.158
HSC Connection
Sno. Total Nos.
1 1400
Other Details
4.15
0.00
4.35
22-Jun-2025
26-Sep-2025