Project Completion Certificate (Ground Water)
Scheme ID: 20057950 Name of Scheme: UMRARI JJM No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 4410 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 02-Feb-2024 Actual Date of Completion (Capex): 22-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 22 M/ 119.8 M UMRARI 27.272256 80.387772
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.890 M³ per Min /41Mtr UMRARI 27.272256 80.387772
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 275 KL/ 12 Mtr UMRARI 27.272302 80.387624
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 200 0.022
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 4.3047
2 HDPE Pipe PN-6: Class PE-100 75 2.2976
3 HDPE Pipe PN-6: Class PE-100 90 2.3106
4 HDPE Pipe PN-6: Class PE-100 110 1.0444
5 HDPE Pipe PN-6: Class PE-100 140 1.3816
6 HDPE Pipe PN-6: Class PE-100 180 0.9145
HSC Connection
Sno. Total Nos.
1 610
Other Details
2.59
0.00
2.59
21-Mar-2024
26-Sep-2025