Project Completion Certificate (Ground Water)
Scheme ID: 20057974 Name of Scheme: NOORPUR KARHI WSS No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2720 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 25-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.00/78.84 NOORPUR KARHI 27.682844 79.619513
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP - 1 34.44 M3/41 M NOORPUR KARHI 27.682844 79.619513
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 150 KL-14M NOORPUR KARHI 27.682852 79.619521
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6 KG 63 8.894
2 HDPE / 6 KG 75 0.143
3 HDPE / 6 KG 90 0.310
4 HDPE / 6 KG 110 0.055
5 HDPE / 6 KG 140 1.721
6 HDPE / 6 KG 160 0.040
HSC Connection
Sno. Total Nos.
1 501
Other Details
1.85
0.00
2.02
24-Oct-2024
06-Dec-2024