Project Completion Certificate (Ground Water)
Scheme ID: 20057993 Name of Scheme: JILGAON (GOGP) JJM No. of Villages: 3 No. of Habitation Covered: 4
Total Population Covered: 3400 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Jul-2024 Actual Date of Completion (Capex): 29-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 23M/108M JILGAON 27.384183 79.843154
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 43.2M³/45M JILGAON 27.384183 79.843154
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225KL/16M JILGAON 27.384183 79.843154
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 3.984
2 HDPE PIPE PN:-6 75 3.904
3 HDPE PIPE PN:-6 90 1.247
4 HDPE PIPE PN:-6 110 1.064
5 HDPE PIPE PN:-6 125 0.123
6 HDPE PIPE PN:-6 140 1.571
7 HDPE PIPE PN:-6 160 0.00
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 0.257
HSC Connection
Sno. Total Nos.
1 800
Other Details
2.55
0.00
2.75
28-Aug-2025
21-Sep-2025