Project Completion Certificate (Ground Water)
Scheme ID: 20058009 Name of Scheme: KAKVAHI JJM No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2720 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Jul-2024 Actual Date of Completion (Capex): 18-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18M/111M KAKWAHI 27.449406 80.132353
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 34.2M³/43M KAKWAHI 27.449406 80.132353
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175KL/14M KAKWAHI 27.449406 80.132353
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.002
2 DI PIPE 150 0.031
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 3.402
2 HDPE PIPE 75 3.212
3 HDPE PIPE 90 0.500
4 HDPE PIPE 110 0.00
5 HDPE PIPE 125 1.298
6 HDPE PIPE 140 0.00
7 HDPE PIPE 160 0.345
8 HDPE PIPE 180 0.00
9 HDPE PIPE 200 0.00
HSC Connection
Sno. Total Nos.
1 595
Other Details
2.00
0.00
2.07
17-Jun-2025
25-Sep-2025