Project Completion Certificate (Ground Water)
Scheme ID: 20058119 Name of Scheme: MENDUA MIRGAWA JJM No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 2670 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Jul-2024 Actual Date of Completion (Capex): 15-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 33.6M³/48M MENDUA MIRGAWA 27.462166 80.13566
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175KL/12M MENDUA MIRGAWA 27.462166 80.13566
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.002
2 DI PIPE 150 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 4.371
2 HDPE PIPE PN:-6 75 3.458
3 HDPE PIPE PN:-6 90 2.201
4 HDPE PIPE PN:-6 110 0.346
5 HDPE PIPE PN:-6 125 0.00
6 HDPE PIPE PN:-6 140 0.446
7 HDPE PIPE PN:-6 160 0.049
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 0.00
HSC Connection
Sno. Total Nos.
1 650
Other Details
2.30
0.00
2.29
14-Aug-2025
25-Sep-2025