Project Completion Certificate (Ground Water)
Scheme ID: 20058175 Name of Scheme: HASNAPUR (GOGP) JJM No. of Villages: 3 No. of Habitation Covered: 5
Total Population Covered: 6520 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Aug-2024 Actual Date of Completion (Capex): 28-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30M/104M HASNAPUR 27.705232 79.971391
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 82.2M³/45M HASNAPUR 27.705232 79.971391
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 400KL/16M HASNAPUR 27.705232 79.971391
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.003
2 DI PIPE 150 0.002
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 5.038
2 HDPE PIPE PN:-6 75 3.160
3 HDPE PIPE PN:-6 90 0.771
4 HDPE PIPE PN:-6 110 1.850
5 HDPE PIPE PN:-6 125 0.117
6 HDPE PIPE PN:-6 140 0.258
7 HDPE PIPE PN:-6 160 0.775
8 HDPE PIPE PN:-6 180 0.974
9 HDPE PIPE PN:-6 200 1.582
HSC Connection
Sno. Total Nos.
1 1117
Other Details
4.17
0.00
4.40
27-Aug-2025
25-Sep-2025