Project Completion Certificate (Ground Water)
Scheme ID: 20058212 Name of Scheme: HIROLI KUTUB NAGAR JJM No. of Villages: 3 No. of Habitation Covered: 4
Total Population Covered: 2210 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Jul-2024 Actual Date of Completion (Capex): 22-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18M/104M HIROLI KUTUB NAGAR 27.663986 79.915101
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 28.2M³/45M HIROLI KUTUB NAGAR 27.663986 79.915101
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150KL / 14M HIROLI KUTUB NAGAR 27.663986 79.915101
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.002
2 DI PIPE 150 0.030
3 DI PIPE 200 0.002
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 1.688
2 HDPE PIPE PN:-6 75 1.484
3 HDPE PIPE PN:-6 90 0.927
4 HDPE PIPE PN:-6 110 0.058
5 HDPE PIPE PN:-6 125 0.029
6 HDPE PIPE PN:-6 140 1.271
7 HDPE PIPE PN:-6 160 0.228
8 HDPE PIPE PN:-6 180 1.900
9 HDPE PIPE PN:-6 200 0.00
HSC Connection
Sno. Total Nos.
1 580
Other Details
1.91
0.00
2.19
21-Jul-2025
25-Sep-2025