Project Completion Certificate (Ground Water)
Scheme ID: 20058554 Name of Scheme: RO Bhudsudi Khas Village Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 8
Total Population Covered: 3680 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-May-2024 Actual Date of Completion (Capex): 23-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Slotted Pipe 150mm 30 TW 25.94111 83.7491183
2 Plain Pipe 150mm 34.41 TW 25.94111 83.7491183
3 Housing Pipe 200mm 41.9 TW 25.94111 83.7491183
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Submersible PUmp 800/46 TW 25.94111 83.7491183
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zinc Tank 250/18 OHT 25.94113 83.7491181
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 13.42
2 HDPE Pipe PN-6: Class PE-100 75 1.25
3 HDPE Pipe PN-6: Class PE-100 90 2.73
4 HDPE Pipe PN-6: Class PE-100 110 0.92
5 HDPE Pipe PN-6: Class PE-100 140 0.67
HSC Connection
Sno. Total Nos.
1 527
Other Details
3.02
2.80
2.39
04-Dec-2025
23-Dec-2025