Project Completion Certificate (Ground Water)
Scheme ID: 20058573 Name of Scheme: SAHADT NAGAR JJM No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 4720 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Aug-2024 Actual Date of Completion (Capex): 28-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 59.4M³/45M SAHADT NAGAR 27.685768 80.26258
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300KL/16M SAHADT NAGAR 27.685768 80.26258
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.002
2 DI PIPE 200 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 5.894
2 HDPE PIPE PN:-6 75 5.475
3 HDPE PIPE PN:-6 90 4.742
4 HDPE PIPE PN:-6 110 1.008
5 HDPE PIPE PN:-6 125 0.183
6 HDPE PIPE PN:-6 140 0.00
7 HDPE PIPE PN:-6 160 0.00
8 HDPE PIPE PN:-6 180 2.372
9 HDPE PIPE PN:-6 200 0.049
HSC Connection
Sno. Total Nos.
Other Details
3.57
0.00
3.55
27-Jun-2025
26-Sep-2025