Project Completion Certificate (Ground Water)
Scheme ID: 20058610 Name of Scheme: KINHOTI JJM No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2800 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 02-Feb-2024 Actual Date of Completion (Capex): 06-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18 M/ 103.8 M KINHOTI 27.116096 80.540531
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.600 M³ per Min /43Mtr KINHOTI 27.116096 80.540531
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL/ 12 Mtr KINHOTI 27.11602 80.540525
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.019
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 4.0442
2 HDPE Pipe PN-6: Class PE-100 75 2.0153
3 HDPE Pipe PN-6: Class PE-100 90 2.0585
4 HDPE Pipe PN-6: Class PE-100 110 0.5795
5 HDPE Pipe PN-6: Class PE-100 125 0.6336
6 HDPE Pipe PN-6: Class PE-100 160 0.3661
HSC Connection
Sno. Total Nos.
1 673
Other Details
2.32
0.00
2.29
05-Jan-2025
26-Sep-2025