Project Completion Certificate (Ground Water)
Scheme ID: 20058614 Name of Scheme: MALEHRA JJM No. of Villages: 1 No. of Habitation Covered: 10
Total Population Covered: 7080 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Feb-2024 Actual Date of Completion (Capex): 15-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30 M/ 94.3 M MALEHRA 27.154007 80.486783
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.480 M³ per Min /45Mtr MALEHRA 27.154007 80.486783
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 425 KL/ 16 Mtr MALEHRA 27.153942 80.486968
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 200 0.017
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 5.7429
2 HDPE Pipe PN-6: Class PE-100 75 7.9568
3 HDPE Pipe PN-6: Class PE-100 90 5.0063
4 HDPE Pipe PN-6: Class PE-100 100 4.2352
5 HDPE Pipe PN-6: Class PE-100 125 2.388
6 HDPE Pipe PN-6: Class PE-100 140 0.8134
7 HDPE Pipe PN-6: Class PE-100 160 0.194
8 HDPE Pipe PN-6: Class PE-100 200 0.711
HSC Connection
Sno. Total Nos.
1 1147
Other Details
4.32
0.00
4.32
14-Aug-2024
23-Sep-2026