Project Completion Certificate (Ground Water)
Scheme ID: 20058703 Name of Scheme: Muhammad Chakfaridpur WSS No. of Villages: 4 No. of Habitation Covered: 8
Total Population Covered: 6130 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 27-Dec-2022 Actual Date of Completion (Capex): 01-Jul-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 42/49.8 Muhammad Chakfaridpur 26° 29' 2.2128" N 82° 54' 59.868" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 63/45 Muhammad Chakfaridpur 26° 29' 2.2128" N 82° 54' 59.868" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tank 300/14 Muhammad Chakfaridpur 26° 29' 2.2128" N 82° 54' 59.868" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 23.511
2 HDPE Pipe PN-6: Class PE-100 75 4.162
3 HDPE Pipe PN-6: Class PE-100 90 2873
4 HDPE Pipe PN-6: Class PE-100 110 1.594
5 HDPE Pipe PN-6: Class PE-100 125 1.153
6 HDPE Pipe PN-6: Class PE-100 140 0.528
7 HDPE Pipe PN-6: Class PE-100 160 0.419
8 HDPE Pipe PN-6: Class PE-100 180 0.139
9 HDPE Pipe PN-6: Class PE-100 200 0.712
HSC Connection
Sno. Total Nos.
1 850
Other Details
392.11
0.00
0.00
19-Oct-2026
20-Oct-2026