Scheme ID: 20058805 Name of Scheme: Adhiyapur No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 4250 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Jan-2024 Actual Date of Completion (Capex): 27-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 28.02/154.30 Adhiyapur 26.852418 78.976165
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 51.02(M³/Hr.)/57Mtr. Adhiyapur 26.852418 78.976165
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/16 Adhiyapur 26.852418 78.976165
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.012
2 HDPE 75 1.634
3 HDPE 90 1.891
4 HDPE 110 2.389
5 HDPE 140 2.261
6 HDPE 160 2.121
7 HDPE 180 1.173
8 HDPE 200 0.277
HSC Connection
Sno. Total Nos.
1 777
Other Details
3.34
4.08
4.08
02-Jul-2024
03-Jul-2024