Scheme ID: 20058810 Name of Scheme: DHANSINI WATERT SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3504 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 19-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 36.09/154.19 Dhansini 29.603416 78.284897
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 700/59 Dhansini 29.603416 78.284897
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200/16 Dhansini 29.603416 78.284897
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI- K7 150 0.0325
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 4.398
2 HDPE PIPW 75 0.291
3 HDPE PIPE 90 0.821
4 HDPE PIPE 110 0.123
5 HDPE PIPE 125 0.079
6 HDPE PIPE 160 0.170
7 HDPE PIPE 180 0.219
8 HDPE PIPE 200 0.308
HSC Connection
Sno. Total Nos.
1 700
Other Details
2.40
0.00
2.50
19-Jul-2026
20-Jul-2026