Project Completion Certificate (Ground Water)
Scheme ID: 20059165 Name of Scheme: UMARI WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 11
Total Population Covered: 2880 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Dec-2023 Actual Date of Completion (Capex): 25-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 26.00/84.00 UMARI 26.377570 82.137584
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 600LPM/46M UMARI 26.377570 82.137584
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL/14M UMARI 26.377570 82.137584
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.010
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 11.762
2 HDPE-PN-6 , PE-100 75 4.145
3 HDPE-PN-6 , PE-100 90 0.699
4 HDPE-PN-6 , PE-100 110 0.903
5 HDPE-PN-6 , PE-100 140 1.717
6 HDPE-PN-6 , PE-100 160 0.024
HSC Connection
Sno. Total Nos.
1 595
Other Details
2.57
0.00
2.56
18-Apr-2026
01-May-2026