Project Completion Certificate (Ground Water)
Scheme ID: 20059262 Name of Scheme: MURCHA (GOGP) JJM No. of Villages: 3 No. of Habitation Covered: 8
Total Population Covered: 3380 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Aug-2024 Actual Date of Completion (Capex): 30-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24M / 227M MURCHA 27.22558 79.767534
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 42.6M³/45M MURCHA 27.22558 79.767534
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225KL/16M MURCHA 27.22558 79.767534
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.002
2 DI PIPE 150 0.024
3 DI PIPE 200 0.004
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:6 63 3.825
2 HDPE PIPE PN:6 75 3.061
3 HDPE PIPE PN:6 90 2.308
4 HDPE PIPE PN:6 110 1.334
5 HDPE PIPE PN:6 125 0.00
6 HDPE PIPE PN:6 140 0.792
7 HDPE PIPE PN:6 160 1.340
8 HDPE PIPE PN:6 180 0.00
9 HDPE PIPE PN:6 200 0.111
HSC Connection
Sno. Total Nos.
1 568
Other Details
2.64
0.00
2.68
29-Jul-2025
25-Sep-2025