Project Completion Certificate (Ground Water)
Scheme ID: 20059444 Name of Scheme: Fareedpur Kutub Water Supply Scheme No. of Villages: 6 No. of Habitation Covered: 9
Total Population Covered: 4190 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Dec-2023 Actual Date of Completion (Capex): 24-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell Assembly 36.00/105.80 Fareedpur Kutub 26.53475935 82.61941798
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Ac Submersible Pump 17.5 HP 0.9/46 Fareedpur Kutub 26.53475935 82.61941798
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 250/16 Fareedpur Kutub 26.53475935 82.61941798
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 22.20
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6:Class PE.100 90 1.35
2 HDPE Pipe PN-6:Class PE.100 75 0.58
3 HDPE Pipe PN-6:Class PE.100 63 11.33
4 HDPE Pipe PN-6:Class PE.100 110 1.44
5 HDPE Pipe PN-6:Class PE.100 125 0.29
6 HDPE Pipe PN-6:Class PE.100 140 0.40
7 HDPE Pipe PN-6:Class PE.100 160 0.51
8 HDPE Pipe PN-6:Class PE.100 200 0.76
HSC Connection
Sno. Total Nos.
1 700
Other Details
3.13
3.13
3.13
25-Jul-2026