Project Completion Certificate (Ground Water)
Scheme ID: 20060121 Name of Scheme: Kurli WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3536 Base Year: 2022 Intermediate Year: 2036 Design Year: 2052
Date of Completion (As per Contract): 02-Aug-2024 Actual Date of Completion (Capex): 14-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 28.08 M / 98.53M Kurli 28.548163 77.734899
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 660 LPM / 49 M Kurli 28.548163 77.734899
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KL / 16 M Kurli 28.548248 77.735055
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 29.60
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.64
2 HDPE 75 0.35
3 HDPE 90 0.36
4 HDPE 110 0.38
5 HDPE 125 0.61
6 HDPE 160 0.79
HSC Connection
Sno. Total Nos.
1 667
Other Details
2.34
2.33
2.38
31-Mar-2026
01-Apr-2026