Project Completion Certificate (Ground Water)
Scheme ID: 20060194 Name of Scheme: Nimkhera WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4647 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Aug-2024 Actual Date of Completion (Capex): 04-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 33.3 M / 78.27 M Nimkhera 28.361682 77.872391
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 990 LPM / 47 M Nimkhera 28.361682 77.872391
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300 KL / 14 M Nimkhera 28.361790 77.872494
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 19.30
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.48
2 HDPE 75 0.85
3 HDPE 90 0.37
4 HDPE 110 0.077
5 HDPE 125 0.040
6 HDPE 140 0.029
7 HDPE 160 0.13
8 HDPE 180 0.21
9 HDPE 200 1.17
HSC Connection
Sno. Total Nos.
1 836
Other Details
2.71
2.68
2.72
31-Mar-2026
01-Apr-2026