Project Completion Certificate (Ground Water)
Scheme ID: 20060260 Name of Scheme: MANPARA (GOGP) JJM No. of Villages: 5 No. of Habitation Covered: 11
Total Population Covered: 7030 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 10-Sep-2024 Actual Date of Completion (Capex): 28-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 32M / 112M MANPARA 27.620013 79.819199
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 88.8M³/47M MANPARA 27.620013 79.819199
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 425KL/18M MANPARA 27.620013 79.819199
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.002
2 DI PIPE 200 0.036
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 9.172
2 HDPE PIPE PN:-6 75 8.201
3 HDPE PIPE PN:-6 90 5.490
4 HDPE PIPE PN:-6 110 2.586
5 HDPE PIPE PN:-6 125 1.158
6 HDPE PIPE PN:-6 140 0.937
7 HDPE PIPE PN:-6 160 2.303
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 1.189
HSC Connection
Sno. Total Nos.
1 1188
Other Details
4.98
0.00
4.93
27-Jul-2025
25-Sep-2025