| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20060368 | Name of Scheme: RAMAPUR KUWARPUR JJM | No. of Villages: 4 | No. of Habitation Covered: 5 |
| Total Population Covered: 4540 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 26-Jul-2024 | Actual Date of Completion (Capex): 26-Apr-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 27M/116M | RAMAPUR KUWARPUR | 27.588182 | 79.786327 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 57.6M³ / 47M | RAMAPUR KUWARPUR | 27.588182 | 79.786327 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 300KL/18M | RAMAPUR KUWARPUR | 27.588182 | 79.786327 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | 0.002 | |
| 2 | DI PIPE | 200 | 0.026 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN:-6 | 63 | 3.63 | |
| 2 | HDPE PIPE PN:-6 | 75 | 3.009 | |
| 3 | HDPE PIPE PN:-6 | 90 | 3.286 | |
| 4 | HDPE PIPE PN:-6 | 110 | 1.846 | |
| 5 | HDPE PIPE PN:-6 | 125 | 1.364 | |
| 6 | HDPE PIPE PN:-6 | 140 | 1.220 | |
| 7 | HDPE PIPE PN:-6 | 160 | 1.662 | |
| 8 | HDPE PIPE PN:-6 | 180 | 0.00 | |
| 9 | HDPE PIPE PN:-6 | 200 | 0.037 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 701 |