Project Completion Certificate (Ground Water)
Scheme ID: 20060411 Name of Scheme: SATAUTHA JJM No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 4800 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Aug-2024 Actual Date of Completion (Capex): 29-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30M / 95M SATAUTHA 27.348059 79.832118
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 60.6M³/43M SATAUTHA 27.348059 79.832118
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300KL / 14M SATAUTHA 27.348059 79.832118
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.002
2 DI PIPE 200 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 3.686
2 HDPE PIPE PN:-6 75 5.796
3 HDPE PIPE PN:-6 90 0.949
4 HDPE PIPE PN:-6 110 1.704
5 HDPE PIPE PN:-6 125 1.471
6 HDPE PIPE PN:-6 140 0.249
7 HDPE PIPE PN:-6 160 1.260
8 HDPE PIPE PN:-6 180 0.120
9 HDPE PIPE PN:-6 200 0.921
HSC Connection
Sno. Total Nos.
1 874
Other Details
3.13
0.00
3.75
28-Jun-2025
26-Sep-2025