Project Completion Certificate (Ground Water)
Scheme ID: 20060433 Name of Scheme: PARUCHI JJM No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 1790 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 02-Feb-2024 Actual Date of Completion (Capex): 26-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18 M/ 125.8 M PARUCHI 27.302093 80.039358
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.380 M³ per Min /41Mtr PARUCHI 27.302093 80.039358
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100 KL/ 12 Mtr PARUCHI 27.302267 80.039377
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.021
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 2.322
2 HDPE Pipe PN-6: Class PE-100 75 1.385
3 HDPE Pipe PN-6: Class PE-100 90 1.736
4 HDPE Pipe PN-6: Class PE-100 110 0.232
5 HDPE Pipe PN-6: Class PE-100 125 2.316
6 HDPE Pipe PN-6: Class PE-100 140 0.053
HSC Connection
Sno. Total Nos.
1 324
Other Details
1.66
0.00
1.79
25-Sep-2024
26-Sep-2025