| Scheme ID: 20060540 | Name of Scheme: MEOTHA (GOGP) JJM | No. of Villages: 4 | No. of Habitation Covered: 4 |
| Total Population Covered: 3740 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 22-Sep-2024 | Actual Date of Completion (Capex): 25-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 20M/106M | MEOTHA | 27.279531 | 79.94541 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 46.8M³/45M | MEOTHA | 27.279531 | 79.94541 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225KL/16M | MEOTHA | 27.279531 | 79.94541 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 100 | 0.002 | |
| 2 | DI PIPE | 150 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN:-6 | 63 | 4.081 | |
| 2 | HDPE PIPE PN:-6 | 75 | 3.699 | |
| 3 | HDPE PIPE PN:-6 | 90 | 1.527 | |
| 4 | HDPE PIPE PN:-6 | 110 | 0.572 | |
| 5 | HDPE PIPE PN:-6 | 125 | 0.142 | |
| 6 | HDPE PIPE PN:-6 | 140 | 0.279 | |
| 7 | HDPE PIPE PN:-6 | 160 | 2.113 | |
| 8 | HDPE PIPE PN:-6 | 180 | 0.166 | |
| 9 | HDPE PIPE PN:-6 | 200 | 0.573 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 700 |