Project Completion Certificate (Ground Water)
Scheme ID: 20060540 Name of Scheme: MEOTHA (GOGP) JJM No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 3740 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 22-Sep-2024 Actual Date of Completion (Capex): 25-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 20M/106M MEOTHA 27.279531 79.94541
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 46.8M³/45M MEOTHA 27.279531 79.94541
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225KL/16M MEOTHA 27.279531 79.94541
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.002
2 DI PIPE 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 4.081
2 HDPE PIPE PN:-6 75 3.699
3 HDPE PIPE PN:-6 90 1.527
4 HDPE PIPE PN:-6 110 0.572
5 HDPE PIPE PN:-6 125 0.142
6 HDPE PIPE PN:-6 140 0.279
7 HDPE PIPE PN:-6 160 2.113
8 HDPE PIPE PN:-6 180 0.166
9 HDPE PIPE PN:-6 200 0.573
HSC Connection
Sno. Total Nos.
1 700
Other Details
3.06
0.00
3.05
24-Jun-2025
25-Sep-2025